The project is about a construction design and dimensioning of a roofing between the BlueBox (building for architecture faculty) and the H-building (seminar building)
Voor de studies en de realisering van de Hans Wilsdorf-brug was een multidisciplinair team van deskundigen nodig op het gebied van: speciale werken, weg- en waterbouwkunde, milieuvraagstukken en brugontwerp, allemaal geïntegreerd in één bedrijf.
De Zonnegroet is a warm passive house made of hempcrete in a dynamic design language and finished with high-quality ecological and bio-based building materials.
This project deals with the installation of a twin-shaft lime kiln superstructure. The extension itself is assembled “on the ground” and is then lifted and installed on top.
We invite you to browse through the different user projects.
Tip: if you change the language in the upper right corner, you'll also discover the international projects.
Have fun!
Don't miss anything
Sign up to our newsletter
The most valuable industry insights, up-to-date software tips & tricks, exclusive webinar invitations and much more: subscribing to our monthly newsletter is a must!
Don't hesitate and subscribe today! In case, unsubscribing is easy afterwards.